Case study · Hackney
Shower room refit in Hackney
A small Hackney shower room tiled floor to ceiling and refitted with a tray, glass enclosure, rainfall shower and vanity unit in August 2025, with new flooring fitted the following week.
- LocationKing's Park, Hackney (Hackney), E9
- PropertyHome with a compact shower room
- PhotographedAugust 2025
- Estimated cost£4,850 to £8,150 + VAT

The starting point
A narrow shower room with a small window, which needed a full refit to make the most of a tight footprint.
What we did
- Walls tiled floor to ceiling in large-format porcelain, including the window reveal.
- A shower tray and glass enclosure fitted, with a rainfall shower.
- A vanity basin unit and a chrome towel rail.
- Wood-effect flooring fitted separately the following week.
The photos
Every photo was taken on site during the job. Click any photo to enlarge it.
During the work
After
How long it took
The tiled room was photographed on 4 August 2025 and the finished shower room on 8 August. The new flooring was photographed on 16 August.
What this job would cost at 2026 London rates
Estimated from the photographed scope, not the client's invoice
| Item | What the photos show | Estimate (ex VAT) |
|---|---|---|
| Shower room refit | Full tiling, tray, enclosure, shower, vanity, towel rail | £4,600 to £7,500 |
| Flooring | Around 10 m² of wood-effect flooring | £250 to £650 |
| Estimated total | £4,850 to £8,150 | |
Shower room: between the cosmetic and mid-range tiers in our Bathroom Renovation Cost guide (£5,500 to £9,000 for a small room), ex VAT. Flooring: £25 to £65 per m² fitted in London (Checkatrade, MyBuilder, MyJobQuote). Typical London market ranges, not fixed Soraiz Builders prices.
The services behind this job
More projects like this
8 photosHarrow Weald (Harrow)
Bathroom refit and flat refresh in Harrow Weald
A Harrow Weald flat turned around in a week in January 2026: a new bath and electric shower, new wood-effect flooring in the living room and hall, and a full repaint.
Read the case study
7 photosAddlestone (outside London)
House refurbishment in Addlestone
An Addlestone house finished in December 2025 with a new grey kitchen, a shower room and cloakroom with concealed cisterns, panelled walls, new carpets and fresh decoration.
Read the case study
22 photosBlendon, Sidcup (Bexley)
Whole-home renovation in Blendon, Sidcup
A Sidcup home taken back to bare walls and finished as new over about 13 weeks: re-plastered throughout, a new kitchen and boiler, a new tiled bathroom, new flooring, decoration and a cleared garden.
Read the case studyPlanning something similar in Hackney?
Tell us what you have in mind. A site visit and a written, fixed-price quote follow, and we reply within 2 hours during business hours.
