Whole-home renovation in Blendon, Sidcup

A Sidcup home taken back to bare walls and finished as new over about 13 weeks: re-plastered throughout, a new kitchen and boiler, a new tiled bathroom, new flooring, decoration and a cleared garden.

  • LocationBlendon, Sidcup (Bexley), DA15
  • PropertyUpstairs home with its own front door and staircase
  • PhotographedJune to November 2025
  • Estimated cost£35,900 to £61,400 + VAT
The living room finished: re-skimmed walls and ceiling, new flooring and LED ceiling lights, Blendon, Sidcup

The starting point

The before photos, taken on 14 June 2025, show a home that had not been touched in decades. Every room had wallpaper and borders, several had dado rails, and the floors were old square tiles lifting off black bitumen adhesive. The ceiling above the living room bay had come down. The kitchen and bathroom were original and worn out, and the rear garden had grown wild.

The brief was the whole home: strip it back, repair what the strip-out revealed, and hand it back with a new kitchen, a new bathroom and every surface finished as new.

What we did

  • Strip-out. Wallpaper, borders, dado rails, carpets, floor tiles and their adhesive, the kitchen and the bathroom suite all came out.
  • Plaster repairs and re-skim. The bay ceiling was rebuilt, blown plaster was cut out and boarded, and every wall and ceiling was skimmed.
  • Bathroom. New copper pipework was run in the stripped room, then the walls were tiled in large-format porcelain and a new bath, basin and WC went in.
  • Kitchen. The old kitchen was stripped to the walls and replaced with a grey gloss galley kitchen, with a new boiler on the wall.
  • Flooring, lighting and decoration. Grey oak-effect plank flooring through the rooms and landing, new carpet on the stairs, LED ceiling lights in place of the old pendants, and white paint throughout.
  • Garden. The overgrown rear garden was cleared back to the fences.

The photos

Every photo was taken on site during the job. Click any photo to enlarge it.

Before

The living room in June 2025: patterned wallpaper, dado rails and old floor tiles lifting off black adhesive.
The ceiling above the bay window had come down, with peeling paper and broken floor tiles below.
A bedroom before the strip-out, with striped wallpaper and a border.
The original bathroom, with a damaged floor and dated suite.
The original kitchen before it was stripped out.
The rear garden, heavily overgrown, before clearance.

During the work

August 2025: plaster and plasterboard on site, mid strip-out.
A bedroom freshly skimmed, the plaster still drying.
September 2025: new copper pipework run in the stripped bathroom before tiling.
Mist coat and paint on site as decorating starts.
October 2025: grey oak-effect plank flooring going down in a bedroom.
The kitchen stripped back to the walls, ready for the new units.
New kitchen carcasses going in during November 2025.

After

The living room finished: re-skimmed walls and ceiling, new flooring and LED ceiling lights.
A finished bedroom with new flooring and white walls.
The staircase with new grey carpet and freshly painted walls.
The landing, finished in the same flooring as the rooms.
The new bathroom: large-format wall tiles, a new bath, basin and WC.
The new bath and tiling in the finished bathroom.
The new kitchen in grey gloss, with a new boiler on the wall.
The finished kitchen run, sink and wall units.
The rear garden after clearance.

How long it took

The dated photos give the timeline. The before photos are from 14 June 2025 and the garden was photographed in mid August. Strip-out was under way by 27 August, with plastering from 29 August into early September and the bathroom pipework and first decorating on 9 to 13 September. The photos pause until mid October, when flooring went down (14 to 20 October) and the bathroom was tiled and fitted (18 October onwards). The kitchen was stripped on 27 October and the new one installed between 18 and 23 November, the same week the garden was cleared. The last rooms were photographed finished on 23 November.

That is roughly 13 weeks from strip-out to handover. Whole-home jobs run in this order for a reason: plaster has to dry before flooring and paint, and the bathroom and kitchen go in once the dusty trades are finished.

What this job would cost at 2026 London rates

Estimated from the photographed scope, not the client's invoice

ItemWhat the photos showEstimate (ex VAT)
Strip-out and wastePaper, borders, rails, tiles and adhesive, carpets, kitchen and bathroom removed£3,000 to £4,500
Ceiling and plaster repairsBay ceiling rebuilt, blown plaster cut out and boarded£900 to £1,600
Re-skim walls and ceilingsAround 200 m² of surface at £20 to £30 per m²£4,000 to £6,000
New kitchenCompact galley kitchen, gloss units, laminate worktop, fitted£6,700 to £12,500
BoilerNew combination boiler in the kitchen£1,500 to £4,500
New bathroomNew pipework, full-height tiling, new bath, basin and WC£6,700 to £10,000
FlooringAround 65 m² of plank flooring plus the stair carpet£2,600 to £4,200
DecorationMist coat and two coats throughout, woodwork in white£3,500 to £5,500
LightingPendants replaced with LED ceiling lights£600 to £1,200
Doors, skirting and fire surroundDark veneer finishes changed to white, skirting made good£1,500 to £2,800
Garden clearanceHeavily overgrown rear garden cleared and waste removed£600 to £1,200
Protection, cleaning and managementSite set-up, protecting finished areas, final clean£1,000 to £1,800
Contingency (10%)For what opening up the walls revealed£3,300 to £5,600
Estimated total£35,900 to £61,400

The final invoice is not published, so each stage the photos show is priced at typical 2026 London rates, assuming an internal floor area of around 70 m². That works out at roughly £510 to £880 per m² before VAT, between the cosmetic and standard refurbishment bands in our House Renovation Cost in London guide, because it added a new kitchen, bathroom and boiler but no full rewire, replumb or layout change. Kitchen: the cosmetic tier of £8,000 to £15,000 from our Kitchen Renovation Cost guide (Checkatrade, Noba & Stod, MyBuilder 2026), ex VAT. Boiler: £1,500 to £4,500 for a like-for-like combi swap, from our Combi vs System Boiler guide. Garden clearance: £380 to £1,200 for a medium London clearance (Fantastic Services, Housekeep 2026), upper half for a heavily overgrown plot.

Rates used: plastering £15 to £30 per m² (MyBuilder, Checkatrade, BestBuilders); laminate or plank flooring £25 to £65 per m² fitted in London (Checkatrade, MyBuilder, MyJobQuote); decoration £350 to £800 per room and £600 to £1,200 for a hall, stairs and landing (Checkatrade, MyBuilder, MyJobQuote); bathroom tiers from our Bathroom Renovation Cost in London guide (Checkatrade, MyJobQuote, MyBuilder 2026), converted to ex VAT. All 2026 figures with London uplifts applied. Typical London market ranges, not fixed Soraiz Builders prices.